We aim to provide customers with superior quality residence at affordable prices
 

Construction Status : Spangle Lok Vihar

As on 10th May 2012

Entrance to Project Site Block B Phase I - (Posession Offered)
Block B Phase 2 Side View
( RCC Structure complete, Brickwork Upto Vth floor complete, Sanitary/Plumbing Internal PPR upto Vth floor complete, Electrical work Wall conduiting upto 3rd floor complete )
Block B Phase 2 Started
( RCC Structure complete, Brickwork Upto Vth floor complete, Sanitary/Plumbing Internal PPR upto Vth floor complete, Electrical work Wall conduiting upto 3rd floor complete )
Block B Phase 2 block
( RCC Structure complete, Brickwork Upto Vth floor complete, Sanitary/Plumbing Internal PPR upto Vth floor complete, Electrical work Wall conduiting upto 3rd floor complete ))
Block A - Service Apartment
( RCC Structure : Flat No 1 to 66, 6-11 complete, Flat No. 1 to 5 Stilt to Ground Floor Column casted )
Block A - Service Apartment
( RCC Structure : Flat No 1 to 66, 6-11 complete, Flat No. 1 to 5 Stilt to Ground Floor Column casted )
Block A - Service Apartment
( RCC Structure : Flat No 1 to 66, 6-11 complete, Flat No. 1 to 5 Stilt to Ground Floor Column casted )
Sample Flat
( Flat Entrance)
Sample Flat
( Common Area)
Kitchen Dining Area
Bedroom angle 1 Bedroom angle 2
Bedroom angle 3 Enroute to Site
Enroute to Site Enroute to Site
Enroute to Site Enroute to Site